Floor Tiling Installation in Sevenoaks

Floor tiling in Sevenoaks with preparation control, clean layout lines and durable threshold detailing.
Floor Tiling Installation in Sevenoaks

Project info

  • Service:
    Floor Tiling
  • Date:
    19/07/2025
  • Duration:
    4–5 days
  • Location:
    Sevenoaks, Kent
  • Surface:
  • Status:
    Completed

Project overview:

This Sevenoaks floor tiling project covered a high-use internal area where visual alignment and long-term wear performance were equally important.\n\nEG Tiling completed substrate checks, established set-out lines from key viewpoints and managed transitions at room thresholds to keep level changes controlled. Installation focused on consistent spacing and clean perimeter detail.\n\nThe completed floor now provides a durable, easy-maintenance surface with a balanced layout and finish quality appropriate for daily traffic.

Materials:

  • Porcelain floor tiles
  • Flexible adhesive
  • Durable grout
  • Transition trims

Project outcome:

  • Balanced large-area tile flow
  • Safe and clean thresholds
  • Robust finish for regular daily use

Challenges:

  • Managing level transitions between adjoining rooms
  • Maintaining alignment across a broader floor area

Planning a similar project?

Send your layout details and we will provide scope, timeline and quotation guidance for your property.

Our Services

Browse our core tiling services and open each page for detailed scope and recent project examples.
View all services