Utility Room Renovation in Deal
Project info
- Service: Kitchen Fitting & Cabinet Assembly
- Date: 18/06/2026
- Duration: 2–3 days
- Location: Deal, Kent
- Surface:
- Status: Completed
Project overview:
This utility room project in Deal involved a complete upgrade to create a practical, durable, and attractive working space. The work included the installation of high-quality laminate flooring throughout the room, providing a hard-wearing surface with a modern timber-effect finish.
New utility units were carefully fitted to maximise storage while maintaining a clean and organised appearance. A solid worktop was installed and professionally finished, creating a durable workspace above the appliances. The project was completed with the installation of a new sink and tap, delivering a fully functional utility area suitable for everyday household use.
Every element was installed with attention to detail, ensuring accurate alignment, clean finishes, and a seamless integration of all components. The result is a bright, practical, and stylish utility room finished to a high professional standard.
Materials:
- Laminate flooring
- Underlay
- Skirting / trims / thresholds
- Tiles (ceramic/porcelain)
- Adhesive / grout
- Edge trims / profiles
- Silicone / sealant
Project outcome:
- Clean, professional finish
- Neat trims / edges / transitions
- Even grout lines / tidy silicone
- Completed on time (as agreed)
- Customer happy with the final result